Rm 218, Tangxing Digital Bld, #6 Tangxing Rd, Xi’an, Shaanxi, China +86 17791258855 [email protected]
The minimum is the run length at which tooling, setup and packaging stop being disproportionate.
A minimum order is not a sales threshold. It is the run length at which the tooling, the line setup, the coating batch and the packaging run stop being disproportionate to the order. For a stock formula in a stock shape, that run is short. For a new shape, a new colour or a new carton, it is longer.
For a stock formula in a standard softgel or tablet shape, the starting point is 100 bottles. That covers a small private-label launch and a sample run for a brand owner who needs to test the market before committing to a larger batch.
A custom shape, a custom colour or a printed carton moves the minimum. The quotation states the minimum for the exact configuration you asked for, so there is no separate “MOQ to be confirmed” step.
One hundred finished bottles, labeled and packed, not one hundred tablets. The bottle count, the tablets or softgels per bottle and the carton are quoted together.
| Format | Counts | Closure | Typical use |
|---|---|---|---|
| HDPE bottle | 60 / 90 / 120 | Induction seal, screw cap | Retail private label |
| HDPE bottle, child-resistant | 60 / 90 / 120 | CR cap, induction seal | Markets that require CR packaging |
| Blister | 10 / 20 / 30 per card | Aluminium foil | Moisture-sensitive tablets |
| Bulk fibre drum | 10 / 20 / 25 kg | Liner, desiccant | Contract filling and further processing |
| Bulk carton | 5 / 10 kg | Liner | Softgels for repacking |
The bottle, the cap and the carton are specified before the artwork is approved. A bottle that is not in stock adds a print and delivery lead time to the schedule.
The standard lead time is 28 days after artwork approval and receipt of the purchase order. That window covers production, coating, packaging and the release COA. It does not include tooling, which is quoted separately, or shipping.
| Configuration | Lead time | What starts the clock |
|---|---|---|
| Stock formula, stock shape | 28 days | Artwork approval and purchase order |
| New softgel die or tablet punch | Tooling lead time + 28 days | Tooling order |
| New bottle or carton | Print lead time + 28 days | Print approval |
| Third-party testing | Laboratory turnaround | Sample receipt at the laboratory |
A useful RFQ has six items. With them, the quotation can be specific; without them, it has to be generic.
The flow is fixed so that nothing is ordered twice or missed.
Changes after artwork approval move the schedule. Changes after tooling move the schedule and the tooling charge. The quotation states which stage the order is in.
Each row maps one product in this range to the parameter this document controls. The product pages link back to their own row; when you compare two products, compare the method column before the number.
| Product | Standard format | MOQ | What changes the run |
|---|---|---|---|
| Fish Oil Softgel | Softgel | 100 bottles (finished goods); bulk minimum on quotation | Softgel die; stock shape avoids tooling |
| Black Seed Oil Softgel | Softgel | 100 bottles (finished goods); bulk minimum on quotation | Softgel die; vegetarian shell may need a new die |
| Oregano Oil Softgel | Softgel | 100 bottles (finished goods); bulk minimum on quotation | Softgel die; carrier oil change does not need new tooling |
| Oregano & Black Seed Oil Softgel | Softgel | 100 bottles (finished goods); bulk minimum on quotation | Softgel die; ratio change does not need new tooling |
| Spirulina Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; film coat adds a coating batch |
| Chlorella Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; film coat adds a coating batch |
| Spirulina & Chlorella Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; film coat adds a coating batch |
| Shilajit Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; film coat and desiccant |
| Shilajit & Ashwagandha Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; film coat and desiccant |
| Multi-Mineral Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; high mineral load may need a larger tablet |
| Multi-Magnesium Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; elemental load affects tablet size |
| Magnesium Glycinate Tablets | Tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; elemental load affects tablet size |
| SAMe Tablets | Enteric-coated tablet | 100 bottles (finished goods); bulk minimum on quotation | Tablet punch; enteric coating adds a coating batch |